SC(JGA) Copper Lugs Without Checking Hole
LILIAN copper lugs made by T2 pure copper tube with good electrical performance, resistance to galvanic corrosion, and long service life, they are suitable for connection the copper cable to other electrical equipment, like distribution terminal block,fuse terminal block,solar panels,home applications,etc., .Terminal lugs can be crimped by hydraulic cable lugs crimper tool or hammer style crimper.Our terminal lugs with heavy duty construction improves high temperature durability and closed design seals out the moisture, ensure connection reliability.The ends with high standard flared opening for wire insert more easier.
Material
Copper cable lugs are made of 99.9% pure copper tube with tinned coating for corrosion protection
Working temperature: -55°C ~ 150°C.
Cable lugs type: copper cable lug,copper tinned cable lug,aluminum cable lug,bimetallic lugs,mechanical connectors and lugs.
ITEM NO. | Dimension(mm) | |||||
Φd2 | B | L | ΦD | Φd | E | |
SC16-5NH | 4.3 | 7.5 | 18 | 3.1 | 1.9 | 6.5 |
SC16-6NH | 5.2 | 8 | 18 | |||
SC16-8NH | 6.5 | 9.2 | 18 | 3.4 | ||
SC16-10NH | 4.3 | 8 | 19 | 4 | 2.8 | 7 |
SC16-12NH | 5.2 | 8 | 20 | |||
SC25-5NH | 6.5 | 9.2 | 20 | 4 | 2.6 | |
SC25-6NH | 4.3 | 8 | 19.5 | 4.5 | 3.2 | 7.5 |
SC25-8NH | 5.2 | 8 | 20.5 | |||
SC25-10NH | 6.5 | 9.2 | 22 | |||
SC25-12NH | 8.5 | 12 | 23.5 | 4.8 | ||
SC25-14NH | 5.2 | 9.2 | 22 | 5.1 | 3.7 | 8 |
SC35-5NH | 6.5 | 9.8 | 23 | |||
SC35-6NH | 8.5 | 12 | 24 | 5.3 | ||
SC35-8NH | 10.3 | 12.8 | 24 | |||
SC35-10NH | 5.2 | 10.3 | 24 | 6.1 | 4.5 | 9 |
SC35-12NH | 6.5 | 10.3 | 24 | |||
SC35-14NH | 8.5 | 12 | 25 | |||
SC50-6NH | 10.3 | 13.2 | 26.5 | 6.3 | ||
SC50-8NH | 6.5 | 11 | 27.5 | 7.3 | 5.7 | 11 |
SC50-10NH | 8.5 | 12.5 | 29.5 | |||
SC50-12NH | 10.5 | 14 | 30 | 7.5 | ||
SC50-14NH | 6.5 | 13.1 | 32.5 | 9 | 7.2 | 13.5 |
SC50-16NH | 8.5 | 13.1 | 33 | |||
SC70-8NH | 10.5 | 14.5 | 34 | |||
SC70-10NH | 13 | 16.5 | 37 | |||
SC70-12NH | 6.5 | 15.8 | 36 | 10.8 | 8.5 | 14.5 |
SC70-14NH | 8.5 | 15.8 | 37 | |||
SC70-16NH | 10.5 | 15.8 | 38 | |||
SC95-8NH | 13 | 17.4 | 38 | |||
SC95-10NH | 6.5 | 18.1 | 41 | 12.5 | 9.8 | 17 |
SC95-12NH | 8.5 | 18.1 | 42.5 | |||
SC95-14NH | 10.5 | 18.2 | 44 | |||
SC95-16NH | 13 | 18.2 | 44 | |||
SC120-8NH | 6.5 | 21 | 48.5 | 14.5 | 11.5 | 19.5 |
SC120-10NH | 8.5 | 21 | 48.5 | |||
SC120-12NH | 10.5 | 21 | 50 | |||
SC120-14NH | 13 | 21 | 50 | |||
SC120-16NH | 15 | 21 | 50 | |||
SC120-20NH | 17 | 23 | 50 | |||
SC150-8NH | 8.5 | 24.8 | 57 | 17 | 13.7 | 23.5 |
SC150-10NH | 10.5 | 24.8 | 57 | |||
SC150-12NH | 13 | 24.8 | 57 | |||
SC150-14NH | 15 | 24.8 | 57 | |||
SC150-16NH | 17 | 26 | 57 | |||
SC150-20NH | 8.5 | 27.6 | 63 | 19 | 15 | 25.5 |
SC185-10NH | 10.5 | 27.6 | ||||
SC185-12NH | 13 | 27.6 | ||||
SC185-14NH | 15 | 27.6 | ||||
SC185-16NH | 17 | 27.6 | ||||
SC185-20NH | 21 | 27.6 | ||||
SC240-10NH | 8.5 | 30.5 | 70.5 | 21 | 16.7 | 29 |
SC240-12NH | 10.5 | 30.5 | ||||
SC240-14NH | 13 | 30.5 | ||||
SC240-16NH | 15 | 30.5 | ||||
SC240-20NH | 17 | 30.5 | ||||
SC300-10NH | 21 | 30.5 | ||||
SC300-12NH | 10.5 | 34.5 | 77 | 23.5 | 19.5 | 32 |
SC300-14NH | 13 | 34.5 | ||||
SC300-16NH | 15 | 34.5 | ||||
SC300-20NH | 17 | 34.5 | ||||
SC400-10NH | 21 | 34.5 | ||||
SC400-12NH | 10.5 | 38 | 90.5 | 26 | 21 | 39 |
SC400-14NH | 13 | 38 | ||||
SC400-16NH | 15 | 38 | ||||
SC400-20NH | 17 | 38 | ||||
SC500-10NH | 19 | 38 | ||||
SC500-12NH | 21 | 38 | ||||
SC500-14NH | 10.5 | 43.7 | 100 | 30 | 24 | 43.5 |
SC500-16NH | 13 | 43.7 | ||||
SC500-20NH | 15 | 43.7 | ||||
SC630-10NH | 17 | 43.7 | ||||
SC630-12NH | 21 | 43.7 | ||||
SC630-14NH | 10.5 | 49.5 | 110 | 34 | 27 | 46 |
SC630-16NH | 13 | 49.5 | ||||
SC630-20NH | 15 | 49.5 |
Lnstallation Precautions
1.The screw must be tightened.
2.The cable and copper lug must be inserted in place and pressed with crimping tools.
FAQ
1.What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
3. What is your terms of delivery?
A: EXW, FOB.
4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
8: How do you make our business long-term and good relationship?
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Thanks for your reading.If any product meets your need,Welcome to send us an email.We are sure your any information can be attention without any delay.
We’re sincerely looking forward to your contacts, and always be ready to offer our qualified products with favorable price!